Elegant Trend
Description
Highlights
- Professional Experience World
- Comprehensive Configuration
- Countless Customization
- 30 days free trial > unlimited download opportunity
- Quick support > Support from Shopware-certified developers
Features
- Extensibility > Elegant theme can be extended by apps & plugins .
- Shopping experience world elements > Additional worlds of experience elements allow you to create even more creative worlds of experience.
- Shopping experience worlds columns & layouts > More flexibility through columns and layout blocks in the experience worlds.
- Size variant in the listing > Preview of the item in the article listing; add size variant on hover effect including wish list selection already available in the listing.
- Color Variant> Color variant display on listing
- Search Layouts> expandable, Collapsible
- Header designs > Simple and elegant header
About the Extension
The Elegant Trend theme offers you the ability to add a new theme to your webshop. This theme is highly responsive and comes with a wide range of customizable features and optimized loading speed. With this theme, you can personalize the home page, header, top bar, product listing, product filters, product detail page, status messages, text font, text color, footer, and social media icons on the storefront of your shop.Elegant Theme saves you a lot of time and worry, as the theme comes perfectly preconfigured and includes everything you need: clear instructions, templates, and a ready-to-use shopping experience. Should you encounter any issues, you can find the solution in our open support ticket system, where our experts provide lightning-fast support.
The Elegant Trend offers a highly flexible and modern appearance. It is compatible with almost all plugins, making it a great choice for e-commerce websites. Its responsive design ensures that your website adapts to different screen sizes, providing a seamless browsing experience for users on various devices.
Over €650 worth of Plugins & Apps functionality is included in the theme
Animated SEO slider Element Fashion Teaser Element for the Shopping Experience
Product Slider Element layout with a banner
Countdown Deal Banner Element for the Shopping Experience
Reviews Slider Element in the shopping experience
Blog Element in the shopping experience
Instagram element for a Shopping experience
Manufacturer slider element for a shopping experience
Size Variant display on hover effect
Switch listing view
Article short description in the category listing
Article short description in detail page
Color variants on the detail page
Social media icons on the detail page
Experience World
Animated SEO slider Element: An image-text slider expands the possibilities of the standard slider Fashion Teaser Element: The teaser element gives you the opportunity to place text and links on images
Product Slider Element: The product slider and banner element give you the opportunity to place text, links, and image layouts with a banner
Experience Worlds Columns: More flexibility through additional column blocks in the experience worlds
Experience Worlds layouts: More complex design through additional layout blocks in the worlds of experience
Countdown Deal Banner Element: The countdown element give you the opportunity to set the countdown start date, and end date, and select the product, and description from the backend
Reviews Slider Element: The review slider element give you the opportunity to set the image icon and text and set the rating stars
Blog Element: Blog element give you the opportunity to see the image, blog publish date, add an article, and set the button link according to the respective blog
Layout
Search Layouts: Expandable Layout Top bar Layouts: For a clean look
Optimized product images: Configure the product boxes to match the aspect ratio of your product images
Header
Individual Header: Logo, shop navigation, and categories can be arranged individually Sticky Header: Fixed header on all end devices
Language selection: Language selection display
Footer
Newsletter registration in the footer: Display the newsletter registration in the footer Logo in the footer: Additional logo in the footer Footer Column: Expandable on mobile
Social Media Integration: Set the links to your social media channels
Trusted Badges: Set the certificate icon on the footer
Payment and Shipping Method: Set the payment and shipping method
Category Listing Page
Variant in hover effect view: If you hover over the product, the product size will be displayed on the listing page and a color variant is also available Additional listing functions: In addition to the Wishlist icon
Filters: Filters in the sidebar are expendable
Sidebar: Add additional text and promotion banners
Second item image: Show the second item image in the listing on mouseover
Product Detail Page
Additional Tabs: Individual Tabs on Detail Page
Manufacturer Tab: Manufacturer information as a tab on the detail page
YouTube Video Tab: YouTube Video Tab on the detail page
Gallery Mode Grid: Alternative option of the gallery slider as a gallery grid with two products per row and load more options to other images
Product benefits: Show product benefits per product on the detail page
Short description: Optional short description of the product
Social Media Integration: Set the links to your social media channels
Quick Support
We are here to assist you promptly and free of cost. Our theme documentation provides comprehensive help and instructions for our themes. If you wish to try out Elegant Trend, we will guide you right from the beginning with clear, step-by-step instructions. In case you require our support, you can open a ticket directly here to receive prompt assistance from our team of theme experts
Elegant Theme saves you a lot of time and worry, as the theme comes perfectly preconfigured and includes everything you need: clear instructions, templates, and a ready-to-use shopping experience. Should you encounter any issues, you can find the solution in our open support ticket system, where our experts provide lightning-fast support.
The Elegant Trend offers a highly flexible and modern appearance. It is compatible with almost all plugins, making it a great choice for e-commerce websites. Its responsive design ensures that your website adapts to different screen sizes, providing a seamless browsing experience for users on various devices.
Over €650 worth of Plugins & Apps functionality is included in the theme
Animated SEO slider Element Fashion Teaser Element for the Shopping Experience
Product Slider Element layout with a banner
Countdown Deal Banner Element for the Shopping Experience
Reviews Slider Element in the shopping experience
Blog Element in the shopping experience
Instagram element for a Shopping experience
Manufacturer slider element for a shopping experience
Size Variant display on hover effect
Switch listing view
Article short description in the category listing
Article short description in detail page
Color variants on the detail page
Social media icons on the detail page
Experience World
Animated SEO slider Element: An image-text slider expands the possibilities of the standard slider Fashion Teaser Element: The teaser element gives you the opportunity to place text and links on images
Product Slider Element: The product slider and banner element give you the opportunity to place text, links, and image layouts with a banner
Experience Worlds Columns: More flexibility through additional column blocks in the experience worlds
Experience Worlds layouts: More complex design through additional layout blocks in the worlds of experience
Countdown Deal Banner Element: The countdown element give you the opportunity to set the countdown start date, and end date, and select the product, and description from the backend
Reviews Slider Element: The review slider element give you the opportunity to set the image icon and text and set the rating stars
Blog Element: Blog element give you the opportunity to see the image, blog publish date, add an article, and set the button link according to the respective blog
Layout
Search Layouts: Expandable Layout Top bar Layouts: For a clean look
Optimized product images: Configure the product boxes to match the aspect ratio of your product images
Header
Individual Header: Logo, shop navigation, and categories can be arranged individually Sticky Header: Fixed header on all end devices
Language selection: Language selection display
Footer
Newsletter registration in the footer: Display the newsletter registration in the footer Logo in the footer: Additional logo in the footer Footer Column: Expandable on mobile
Social Media Integration: Set the links to your social media channels
Trusted Badges: Set the certificate icon on the footer
Payment and Shipping Method: Set the payment and shipping method
Category Listing Page
Variant in hover effect view: If you hover over the product, the product size will be displayed on the listing page and a color variant is also available Additional listing functions: In addition to the Wishlist icon
Filters: Filters in the sidebar are expendable
Sidebar: Add additional text and promotion banners
Second item image: Show the second item image in the listing on mouseover
Product Detail Page
Additional Tabs: Individual Tabs on Detail Page
Manufacturer Tab: Manufacturer information as a tab on the detail page
YouTube Video Tab: YouTube Video Tab on the detail page
Gallery Mode Grid: Alternative option of the gallery slider as a gallery grid with two products per row and load more options to other images
Product benefits: Show product benefits per product on the detail page
Short description: Optional short description of the product
Social Media Integration: Set the links to your social media channels
Quick Support
We are here to assist you promptly and free of cost. Our theme documentation provides comprehensive help and instructions for our themes. If you wish to try out Elegant Trend, we will guide you right from the beginning with clear, step-by-step instructions. In case you require our support, you can open a ticket directly here to receive prompt assistance from our team of theme experts
Details
- Available: English, German
- Latest update: 24 November 2026
- Publication date: 13 October 2022
- Version: 3.0.1
- Category: Fashion + clothing
Resources
Reviews (0)
About the Extension Partner
BrandCrock GmbH
Partner Status
-
Shopware
Bronze Partner -
Shopware
Extension Partner
Details
-
Ø-Rating:
3.9
Average rating of 3.9 out of 5 stars
- Partner since: 2017
- Extensions: 50
Support
- Based in: Germany
- Speaks: German, English
- Frontend:
- Go to demo
- Frontend:
- Go to demo
Select Extensions from the left Navigation panel and then click My extensions
Select the Themes tab from the right panel
Select Theme Elegant from the list
Install and activate the Elegant Theme
Go to active Sale Channels
Select the Theme tab from the right panel
Select Elegant Theme & save
3.0.1 6.7.0.0 - 6.7.16.2
- Compatible with the latest Shopware version
- Performance improvements and bug fixes
3.0.0 6.7.0.0 - 6.7.16.2
- Improved header and main navigation layout
- Improved product listing layout
- Improved newsletter section layout
- Improved theme configuration settings
- Fixed product share option on the detail page
- Fixed product deal layout on the detail page
- Fixed search results layout
- Fixed wishlist layout
- Updated Instagram layout and backend configuration options
- Fixed secondary hover image effect on product listings
- Optimized stylesheet performance
- Enhanced footer layout visibility
- Enhanced product detail page gallery slider
2.0.1 6.6.0.0 - 6.6.10.32
Stylesheet optimization
Improved the theme configuration settings
2.0.0 6.6.0.0 - 6.6.10.32
Made theme compatible with version 6.6.x.
Optimized stylesheet bugs
Improved compatibility with different plugins
Enhanced theme configuration settings
1.0.5 6.5.0.0 - 6.5.8.19
Fixed the footer logo
1.0.4 6.5.0.0 - 6.5.8.19
Stylesheet Bug Optimizations: In this release, we've fine-tuned the stylesheet to eliminate bugs, ensuring a smoother and more visually appealing user experience.
Bug Fixes and Performance Improvements: The latest version includes bug fixes and performance enhancements to make the theme more reliable and efficient.
Enhanced Compatibility: We've improved compatibility with various plugins, ensuring our theme integrates with a wider range of third-party extensions.
1.0.3 6.5.0.0 - 6.5.8.19
Made the Shopping Experience widget compatible with Shopware's latest version 6.5.5.*.
Made some fields required related shopping experience widget "Deal Section"
1.0.2 6.5.0.0 - 6.5.8.19
Made it compatible with shopware updated to version 6.5.0
1.0.1 6.4.0.0 - 6.4.20.2
Major changes on Homepage, Listing page and detail page
1.0.0 6.3.0.0 - 6.4.15.0
Initial Release Version